Monthly Archives: May, 2016

Miracle Welcomes New Member with a very Dogmatic Approach

Miracle pawsed yesterday to welcome a fetching new member onto the team. Super Cooper can’t wait to get his teeth sunk into his work and claw in some serious leads. For more de-tail on our products and completed play barks, get on the dog and bone and give us a tinkle.Cooper 2


Zipline Testing at King George’s Field, Barford!

Parish Council Chairman John Murphy puts the new 20m zipline through its paces

An aerial view of the Miracle playground at King George’s Field, Barford

The Playground at King George’s Field, Barford in the latter stages of installation

King George’s Field, Barford Playground Opening

The new playground at King George’s Field, Barford in full swing!

Miracle Playground gets Royal Seal of Approval

Barford, Sherbourne and Wasperton Joint Parish Council and Miracle Design and Play were honoured to have HRH The Duke of Kent re-open the playground at Barford, Warwickshire. Named after the Duke’s grandfather and first opened by his father in 1938, King George’s Field has undergone an exciting and spectacular refurbishment, the centrepiece of which is the new Miracle playground. Dominating the play area is the imposing Mega Tower unit complete with a 3m high curly typhoon slide and a 4m high pyramid net. Local school children were on hand to give the new equipment a thorough first use and, as our case study shows, the playground is a tremendous success!

Barford Case Study

Barford Playground Case Study